North Vidzeme Region Municipal Waste Management Project, Stage 3. Improvement of Daibe Landfill Infrastructure

No. 3DP/3.5.1.2.2./09/ IPIA/VIDM/002
Duration: 17.09.2009 - 16.09.2013
Total costs: 3 147 135 LVL Total eligible costs: 2 591 856 LVL Cohesion Fund co-financing: 2 203 078 LVL

The goal of the project in North Vidzeme Region is to provide high-quality services in waste disposal that would comply with the requirements of environmental protection and normative acts. It is planned to:

  • Build the second cell for waste disposal with a total area of 3.2-3.8 hectares and a capacity of approximately 540 000 m3;
  • Build a mechanical waste pre-treatment centre
  • Supply mechanical waste pre-treatment equipment.