Cohesion Fund

No. 2001/LV/16/P/PE/006
Duration: 21.11.2001. - 31.12.2005.
Total costs: 4 780 906 EUR Cohesion Fund co-financing: 3 346 634 EUR

The goal of the project: to create an environmentally friendly and economically sustainable solid waste management system in North Vidzeme Region, complying with current national requirements and the requirements of the Regulations of the European Community. The waste management system will gradually be adapted to the conditions regulating the amount of waste, its hazard and treatment.

The Outcome of the Project:

  • Completion of building of waste landfill in Daibe (Stalbe Parish, Pārgauja County); supply of equipment: waste compactor, front-end loader. The building was accomplished by Consortium VENCEB & SCO, represented by AS VENCEB (leading partner). Supplier of technical equipment and waste sorting containers – SIA Volvo Truck Latvia. Supervision and construction in landfill Daibe was carried out by SIA Geo Consultants and BARRY International
  • Twelve dumping sites remediated    
  • Nine separated waste collection stations – Eco-Points - established
  • Supply of two garbage trucks and containers.     
No. 006/LV/16/C/PE/001
Duration: 15.12.2006 - 28.02.2007
Total costs: 693 000 EUR. Cohesion Fund co-financing: 485 100 EUR

The goal of the project was the supply and installation of a reverse osmosis plant for the processing of leachate for North Vidzeme waste management regional landfill Daibe as well as training of the personnel for servicing and maintenance of the new equipment.

The Outcome of the Project:

  • In autumn 2006 landfill Daibe received the sandwich-type reverse osmosis leachate treatment plant
  • New equipment was installed in the existing leachate collection system 
  • Training of the personnel was carried out accordingly.   

 

No. 3DP/3.5.1.2.2./09/ IPIA/VIDM/002
Duration: 17.09.2009 - 16.09.2013
Total costs: 3 147 135 LVL Total eligible costs: 2 591 856 LVL Cohesion Fund co-financing: 2 203 078 LVL

The goal of the project in North Vidzeme Region is to provide high-quality services in waste disposal that would comply with the requirements of environmental protection and normative acts. It is planned to:

  • Build the second cell for waste disposal with a total area of 3.2-3.8 hectares and a capacity of approximately 540 000 m3;
  • Build a mechanical waste pre-treatment centre
  • Supply mechanical waste pre-treatment equipment. 
No. 3DP/3.5.1.2.2./11/IPIA/VARAM/005
Duration: 16.12.2011. - 15.12.2012.
Total expenses: 80 717, 76 LVL Total eligible expenses: 55 659, 79 LVL

The goal of the project is to provide the Daibe landfill employees with the respective material and technical basis complying with the highest standards of labour legislation, sanitary requirements and labour environment.
The project will include:

  • Building of new premises with a total floor space of 120 m2 providing cloakrooms and shower rooms for employees of the waste pre-treatment and sorting centre of the landfill Daibe.